EGEE Home | Intranet Home | Search | EDMS Documents | People | Calendar | Agenda maker | Glossary

JRA1: Middleware

euroflag.gif (3058 octets)

Tools Testing Integration Information
Services
Workload
Management
Data
Management
Security Management

Search:

JRA1 Home | Mandate  | Meetings | Presentations | Savannah | EDMS | PPT | PTF

DOCUMENTS

PRESENTATIONS

News

Documents:
  Requirements
  Meetings minutes
  EU deliverables:
    DJRA1.1 - Architecture
    DJRA1.2 - Design
    DJRA1.3 - Release 1
    DJRA1.4 - Architecture revision
    DJRA1.5 - Design revision
    DJRA1.6 - Release 1.5 (second major release)
    DJRA1.7 - Final report
  Technical Notes:
 
  Bug status
  Execution Plan

EU reports:

  Quarterly reports
  Q1 Q2 Q3 Q4
  Q5 Q6 Q7 Q8
  Periodic reports
  P1 P2  

Software engineering:
  Developer's Guide
  Software Configuration and Management
  Release Plan (1st Release)
  Work Plan (2nd Release)
  Test Plan (1st Release)
  Test Plan (2nd Release)

12-13 February, 2007: gLite middleware at the OMII-Europe All-Hands Meeting, Bologna, Italy

January 16th, 2007: JRA1 Status at the EGEE-II All Activity meeting, Bologna, Italy

September 28, 2006: gLite status at the EGEE'06 Conference, Geneva, Switzerland

August 24, 2006: JRA1 Status at the EGEE-II All Activity meeting, CERN, Switzerland

August 22, 2006: The gLite distribution at the OSG consortium meeting, Seattle, WA, USA

July 5, 2006: Architettura di una infrastruttura grid (in Italian), at the Grid2006 event, Milano, Italy

June 28, 2006: gLite and Condor: present and future, at the European Condor Week, Milano, Italy

June 19, 2006: Data management in LCG & EGEE, Policy management and fair share in gLite at the EGEE Workshop on Management of Rights in Production Grids, Paris, France

June 13, 2006: EGEE Middleware: gLite, gLite WMS and IPv6 at the EUChinaGrid workshop, Beijing, China

June 9, 2006: gLite Middleware status and plans, at the LCG Internal Review of Services, CERN, Switzerland

June 7, 2006: Grid Middleware: gLite Status and Plans, at the INFN CCR Workshop, Otranto, Italy

May 8, 2006: gLite Middleware, at the CEOS WGISS 21 meeting, Budapest, Hungary.

April 26, 2006: gLite and Condor: Present and Future, at the Condor week, Madison, Wisconsin

April 4, 2006: Passing Requirement information to the gLite CE via BLAHPD, at the HEPIX Meeting, Rome, Italy

March 1-3, 2006: gLite status and plans, The gLite Workload Management System, Logging and Bookkeeping and Job Provenance services, G-PBox: A framework for grid policy management, The gLite File Transfer Service, Encrypted Data Storage in EGEE, The AMGA Metadata Service, User Applications of R-GMA, at the EGEE User Forum, CERN, Switzerland

February 13-17, 2006: Reliable FTS' Performace, FTS in SC3, AMGA, WMProxy, CREAM, Multiple VO support with R-GMA, CHEP'06, Mumbai, India

More...

March 27-28, 2008: MWSG, Bologna (Italy)

February 20-22, 2008: JRA1 All Hands Meeting, NIKHEF, Amsterdam (The Nederlands)

February 11-14, 2008: EGEE User Forum, Clermont-Ferrand, (France)

January 21-23, 2008: EGEE All Activity Meeting, Sofia (Bulgaria)

December 6-7 2007: MWSG, Berkley (USA)

TOOLS

PROTOTYPE

... Previous news

  EGEE JRA1 shares the SPI tools in common with the LCG Project.
Prototype testbed
 
 

Disclaimer

Contact

Last Modified: 14/12/2005